YGPA replaces aging container-crane lifts and trains GWCT operators

Yeosu Gwangyang Port Authority said it has replaced aging container-crane lifts, passed an occasional inspection, and trained Gwangyang West Container Terminal operators with the manufacturer. LogiBridge Editorial Desk.

 

Author LogiBridge Editorial Desk · Publisher LogiBridge · Date October 7, 2026Source Yeosu Gwangyang Port Authority

 

Yeosu Gwangyang Port Authority, led by President Choi Gwan-ho, said it has finished replacing aging lifts on container cranes and completed a safety inspection and operator training. The lifts passed an occasional inspection, and Gwangyang West Container Terminal staff received practical training with the manufacturer.

 

What was replaced?

The authority said the work was done to keep container cranes operating safely and to improve the work environment. Aging lifts that were discontinued and difficult to maintain were replaced with new equipment so users are safer and the machines can be operated and maintained more reliably.

 

After the replacement, an occasional inspection under the relevant standards returned a pass. The authority said this confirmed the safety and normal operation of the new lifts.

 

What training was given?

Practical training linked with the manufacturer was given to on-site workers at the operator, Gwangyang West Container Terminal (GWCT). It covered main functions and operation, daily checks and maintenance, safety rules during use, and what to do when an abnormal situation occurs. Practice on the installed lifts was included.

 

An authority official said the replacement and training strengthened the basis for safe container-crane operation, and that port facilities will continue to be checked and managed to keep the port environment safe.

 

Key facts

  • Authority: Yeosu Gwangyang Port Authority, President Choi Gwan-ho
  • Work: replacement of aging container-crane lifts discontinued and hard to maintain
  • Inspection: occasional inspection under relevant standards, passed; safety and normal operation confirmed
  • Training: GWCT on-site workers, with the manufacturer
  • Content: functions and operation, daily checks, safety rules, abnormal-situation response, practice on installed lifts

 

What was replaced?Aging lifts on container cranes. They were discontinued and difficult to maintain, so new equipment was installed.

 

Did they pass inspection?Yes. An occasional inspection under the relevant standards returned a pass, and safety and normal operation were confirmed.

 

Who was trained?On-site workers at Gwangyang West Container Terminal, with the manufacturer. Training covered operation, checks, safety rules, abnormal responses, and practice.

 

Citation: LogiBridge Editorial Desk, “YGPA replaces aging container-crane lifts and trains GWCT operators,” LogiBridge, October 7, 2026. Source: Yeosu Gwangyang Port Authority.

글쓴이
비밀번호
비밀번호 확인
평점 주기
작성된 후기가 없습니다.
후기 수정
글쓴이
평점 주기
목록으로 가기
재입고 알림 신청
휴대폰 번호
-
-
재입고 시 알림
페이스북
카카오톡
네이버 블로그
밴드
floating-button-img